Sidebar
Time limit for furnishing GSTR-3B [Rule 61(5) of CGST Rules]
Notification No. 21/2017 - Central...
Notification No. 23/2017 - Central... Notification No. 35/2017 - Central... Notification No. 56/2017 - Central... Notification No. 16/2018 - Central... Notification No. 34/2018 - Central... Notification No. 13/2019 - Central... Notification No. 29/2019 - Central... Notification No. 44/2019 - Central... Notification No. 29/2020 - Central... Notification No. 76/2020 - Central... Time limit for furnishing GSTR-3B ... Notification No. 05/2022 - Central... Notification No. 21/2022 - Central... Notification No. 12/2023 - Central... Notification No. 17/2023 - Central... Notification No. 20/2023 - Central...Notification No. 21/2017 - Central Tax dated 08-08-2017 [Extension of time limit for GSTR-3B]
https://www.gstgyaan.com/notification-no-21-2017-central-tax-dated-08-08-2017-extension-of-time-limit-for-gstr-3b
Notification No. 21/2017-Central Tax dt. 08-08-2017
|
In exercise of the powers conferred by rule 61(5) of the CGSTR, 2017 read with section 168 of the CGSTA, 2017, |
||||||||||||
|
GSTR-3B time limit for all RPs for Jul-17 & Aug-17 = 20th of Next Month Commissioner specifies that GSTR-3B for the month as specified in (2) of the Table below before the dates as specified in column (3) of the said Table, namely:- Table
[1][1st Proviso – Date extended for Specified RPs for Jul-17 to Feb-19 = 31st Mar, 2019 GSTR-3B to be filed for the period from [2][July, 2017 to Feb, 2019] by the taxpayers who have obtained GSTIN in terms of notification No. 31/2018–Central Tax dt. 06-08-2018, shall be furnished on or before the [3][31st day of March, 2019]] |
||||||||||||
|
Refer Notification No. 23/2017-Central Tax dt. 17-08-2017 for further changes for Jul-2017 GSTR-3B Refer Notification No. 35/2017-Central Tax dt. 15-09-2017 for further changes for Aug-2017 GSTR-3B |
GST Gyaan | https://gstgyaan.in | CA Rajesh Ritolia - 9350171263