Sidebar
Extension of time limit of monthly GSTR-01, 02 & 03 [Section 37(1), 38(2) & 39(1) of CGST Act]
Notification No. 58/2017 - Central...
Notification No. 72/2017 - Central... Notification No. 18/2018 - Central... Notification No. 32/2018 - Central... Notification No. 44/2018 - Central... Notification No. 12/2019 - Central... Notification No. 28/2019 - Central... Notification No. 46/2019 - Central... Notification No. 28/2020 - Central... Notification No. 75/2020 - Central... Notification No. 83/2020 - Central... Summary of Extension of Time limit...Notification No. 58/2017 - Central Tax dated 15-11-2017 [Extension of time limit for GSTR-01, 02 & 03]
https://www.gstgyaan.com/notification-no-58-2017-central-tax-dated-15-11-2017-extension-of-time-limit-for-gstr-01-02-03
Notification No. 58/2017-Central Tax dt. 15-11-2017 & superseded by Notification No. 72/2017-Central Tax dt. 29-12-2017
|
In exercise of the powers conferred by the second proviso to section 37(1), read with section 168 of the CGSTA, 2017 and in supersession of notification No. 30/2017-Central Tax dt. 11-09-2017 except as respects things done or omitted to be done before such supersession, |
||||||||||||||||||||||||
|
Date extended for RPs having AT > Rs.1.5 Cr for Jul-17 to Mar-18 Commissioner extends the time limit for furnishing outward supplies in GSTR-1 u/s 37(1) for the months as specified in column (2) of the Table, by such RPs having aggregate turnover > Rs.1.5 cr in the preceding FY or current FY, till the time period as specified in the corresponding entry in column (3) of the said Table, namely:- Table
. |
||||||||||||||||||||||||
|
No Time Limit specified for GSTR-2 & GSTR-3 for FY 2017-18 2. The extension of the time limit for furnishing return u/s 38(2) & 39(1) for the months of July, 2017 to March, 2018 shall be subsequently notified. |
GST Gyaan | https://gstgyaan.in | CA Rajesh Ritolia - 9350171263