Sidebar
Extension of time limit for GSTR-06 [Section 39(4) read with 39(6) of CGST Act]
Notification No. 25/2018 - Central...
Notification No. 30/2018 - Central... Summary of extension of Time limit...Notification No. 25/2018 - Central Tax dated 31-05-2018 [Extension of time limit for GSTR-06 u/s 39(4)]
https://www.gstgyaan.com/notification-no-25-2018-central-tax-dated-31-05-2018-extension-of-time-limit-for-gstr-06-us-39%284%29
Notification No. 25/2018-Central Tax dt. 31-05-2018 & superseded by Notification No. 30/2018-Central Tax dt. 30-07-2018
|
In exercise of the powers conferred by section 39(6) read with section 168 of the CGSTA, 2017, and in supercession of Notification No. 19/2018-Central Tax dt. 28-03-2018 except as respects things done or omitted to be done before such supercession |
|
Date extended for Jul-17 to Jun-18 = 31st Jul, 2018 Commissioner extends the time limit for furnishing the return by an ISD u/s 39(4) read with rule 65 of the CGSTR, 2017, for the months of July, 2017 to June, 2018, till the 31st day of July, 2018. |
GST Gyaan | https://gstgyaan.in | CA Rajesh Ritolia - 9350171263