Sidebar
Extension of time limit for GSTR-06 [Section 39(4) read with 39(6) of CGST Act]
Notification No. 43/2017 - Central...
Notification No. 62/2017 - Central... Notification No. 08/2018 - Central... Notification No. 19/2018 - Central... Notification No. 25/2018 - Central... Notification No. 30/2018 - Central... Summary of extension of Time limit...Notification No. 43/2017 - Central Tax dated 13-10-2017 [Extension of time limit for GSTR-06 u/s 39(4)]
https://www.gstgyaan.com/notification-no-43-2017-central-tax-dated-13-10-2017-extension-of-time-limit-for-gstr-06-us-39%284%29
Notification No. 43/2017-Central Tax dt. 13-10-2017 & superseded by Notification No. 62/2017-Central Tax dt. 15-11-2017
|
In exercise of the powers conferred by section 39(6) read with section 168 of the CGSTA, 2017, and in supercession of Notification No. 31/2017-Central Tax dt. 11-09-2017 except as respects things done or omitted to be done before such supercession |
|
GSTR-06 date extended for Jul-17 to Sep-17 = 15th Nov, 2017 Commissioner extends the time limit for furnishing the return by an ISD 39(4) read with rule 65 of the CGSTR, 2017, for the months of July, 2017, August, 2017 and Sep, 2017 till the 15th day of November, 2017 |
GST Gyaan | https://gstgyaan.in | CA Rajesh Ritolia - 9350171263