Sidebar
Extension of time limit for GSTR-06 [Section 39(4) read with 39(6) of CGST Act]
Notification No. 31/2017 - Central...
Notification No. 43/2017 - Central... Notification No. 62/2017 - Central... Notification No. 08/2018 - Central... Notification No. 19/2018 - Central... Notification No. 25/2018 - Central... Notification No. 30/2018 - Central... Summary of extension of Time limit...Notification No. 31/2017 - Central Tax dated 11-09-2017 [Extension of time limit for GSTR-06 u/s 39(4)]
https://www.gstgyaan.com/notification-no-31-2017-central-tax-dated-11-09-2017-extension-of-time-limit-for-gstr-06-us-39%284%29
Notification No. 31/2017-Central Tax dt. 11-09-2017 superseded by Notification No. 43/2017-Central Tax dt. 13-10-2017
|
In exercise of the powers conferred by section 39(6) read with section 168 of the CGSTA, 2017, and in supercession of Notification No. 26/2017-Central Tax dt. 28-08-2017 except as respects things done or omitted to be done before such supercession |
|
GSTR-06 date extended for Jul-17 Commissioner extends the time limit for furnishing the return by an ISD u/s 39(4) read with rule 65 of the CGSTR, 2017, for the month of July, 2017 upto the 13th October, 2017 |
|
Date shall be notified later on for Aug-17 2. The extension of the time limit, for furnishing the return u/s 39(4), for the month of August, 2017 shall be subsequently notified in the Official Gazette. |
GST Gyaan | https://gstgyaan.in | CA Rajesh Ritolia - 9350171263