Sidebar
Extension of time limit for GSTR-06 [Section 39(4) read with 39(6) of CGST Act]
Notification No. 26/2017 - Central...
Notification No. 31/2017 - Central... Notification No. 43/2017 - Central... Notification No. 62/2017 - Central... Notification No. 08/2018 - Central... Notification No. 19/2018 - Central... Notification No. 25/2018 - Central... Notification No. 30/2018 - Central... Summary of extension of Time limit...Notification No. 26/2017 - Central Tax dated 28-08-2017 [Extension of time limit for GSTR-06 u/s 39(4)]
https://www.gstgyaan.com/notification-no-26-2017-central-tax-dated-28-08-2017-extension-of-time-limit-for-gstr-06-us-39(4)
Notification No. 26/2017-Central Tax dt. 28-08-2017 & superseded by Notification No. 31/2017-Central Tax dt. 11-09-2017
|
In exercise of the powers conferred by section 39(6) read with section 168 of the CGSTA, 2017, |
|||||||||
|
GSTR-6 date extended for Jul-17 & Aug-17 Commissioner extends the time limit for furnishing the return by an ISD u/s 39(4) read with rule 65 of the CGSTR, 2017, for the month as specified in column (2) of the Table below, till the date as specified in column (3) of the said Table, namely: Table
. |
|||||||||
|
2. This notification shall come into force on the date of its publication in the Official Gazette. |
GST Gyaan | https://gstgyaan.in | CA Rajesh Ritolia - 9350171263